Enter the project name so the report can identify which project this assessment is associated with.
Enter the name of the vessel for the report.
Enter the name of the location for the report.
This date, together with the project duration, will be used to determine the project timeline and from that, the estimated downtime.
The project duration is used for the project timeline and estimated downtime.
The project latitude used to extract the Significant Wave Height from NOAA Data.
The project longitude used used to extract the Significant Wave Height NOAA Data.
The operational limit is the maximum weather that the vessel spread can operate safely in.
The marginal limit is doubtful weather the vessel spread can operate.
Weather less than this value is discarded, Weather above this value is discarded from teh summary. 100% includes all data. 80% clips of the 20% highest data etc
Click to set latitude/longitude (snaps to nearest point & 0.5°). Drag the marker to adjust.
About Tool